Doosan Heavy Industries & Construction Wins UAE Barakah Nuclear Power Plant Planning and Preventive Maintenance Project View original image


[Asia Economy Reporter Jeong Hyunjin] Doosan Heavy Industries & Construction announced on the 21st that it has signed a contract with Nawah Energy, the UAE nuclear power plant operator, for the planned and preventive maintenance project of Unit 1 at the Barakah Nuclear Power Plant in the United Arab Emirates (UAE).


Doosan Heavy Industries & Construction signed a long-term maintenance contract in 2019 with Nawah Energy for all four units (Units 1 to 4) of the Barakah Nuclear Power Plant. This recent order is part of the planned and preventive maintenance work carried out under that contract. Doosan Heavy Industries & Construction will inspect major equipment in the reactor system, including turbines and generators, at the currently operating Barakah Unit 1 from April to June next year.


Doosan Heavy Industries & Construction explained that once all four units of the Barakah Nuclear Power Plant enter commercial operation, regular maintenance will be conducted on each unit, with planned and preventive maintenance expected to be carried out two to three times annually.



Park Hongwook, Vice President of Doosan Heavy Industries & Construction, said, "Based on our expertise in manufacturing and supplying main equipment for the UAE Barakah Nuclear Power Plant, the first overseas export nuclear power plant, we will do our best to successfully carry out this maintenance work to ensure that the Barakah Nuclear Power Plant operates safely and efficiently."


This content was produced with the assistance of AI translation services.

© The Asia Business Daily(www.asiae.co.kr). All rights reserved.

Today’s Briefing