Hwasun-gun Extends Application Period for 'Construction Machinery Engine Replacement Support' Until the 28th
[Hwasun=Asia Economy Honam Reporting Headquarters Reporter Kim Ji-woon] Jeollanam-do Hwasun-gun (Governor Gu Chung-gon) announced on the 25th that it will extend the application period for the ‘Old Construction Machinery Engine Replacement Support Project,’ which is being promoted to reduce fine dust and improve air quality, until the 28th.
The support target is construction machinery (forklifts, excavators, etc.) equipped with Tier 1 or lower engines, which must be registered with the county as of the announcement date.
However, if emission reduction devices have been attached or converted to low-emission engines with government subsidy support, they are excluded from the support target.
Owners of construction machinery who wish to apply should check with the engine replacement contractors specified in the announcement whether engine replacement is possible before submitting the application form and required documents to the Environmental Division of the county office.
Hot Picks Today
"How Much Will They Get?" 600 Million vs. 460 Million vs. 160 Million... Samsung Electronics DS Division's 'Three Wallets Under One Roof'
- Opening a Bank Account in Korea Is Too Difficult..."Over 150,000 Won in Notarization Fees Just for a Child's Account and Debit Card" [Foreigner K-Finance Status]②
- Kim Young-hoon, the Problem Solver Who Averted Samsung Electronics' General Strike... Breakthrough Achieved Through the Power of Dialogue
- Room Prices Soar from 60,000 to 760,000 Won and Sudden Cancellations: "We Won't Even Buy Water in Busan" — BTS Fans Outraged
- "Who Is Visiting Japan These Days?" The Once-Crowded Tourist Spots Empty Out... What's Happening?
For more details, refer to the announcement posted in the notice section on the county office website or contact the Environmental Division of the county office.
© The Asia Business Daily(www.asiae.co.kr). All rights reserved.