Seongdong~Nowon Connected 'Dongbuk Line Urban Railway' Fully Launched... Opening in 2025
Total Investment Cost of 1.5963 Trillion KRW
[Asia Economy Reporter Hyunju Lee] The 'Dongbuk Line Urban Railway,' connecting Seongdong and Nowon, will be actively promoted.
On the 14th, Seoul City announced on the 16th that it received the project commencement report from the project operator, Dongbuk Line Urban Railway, and will actively proceed with the project.
The Dongbuk Line Urban Railway private investment project is a 13.4 km line with 16 stations and one vehicle depot, constructed over 60 months, connecting Wangsimni Station in Seongdong-gu, passing Mia Sageori Station, to Sanggye Station in Nowon-gu. The target opening year is 2025.
The construction is divided into four sections built simultaneously, with Kumho Industrial, Hoban Industrial, Hyundai Engineering, Kolon Global, and Daemyung Construction each responsible for a section. Hyundai Rotem will implement the system fields such as signaling and communication across the entire line. The total investment cost is 1.5963 trillion KRW.
Hot Picks Today
Samsung Electronics Introduces New "Special Performance Bonus" for Semiconductors, Paid Entirely in Company Shares
- "Could I Also Receive 370 Billion Won?"... No Limit on 'Stock Manipulation Whistleblower Rewards' Starting the 26th
- "From a 70 Million Won Loss to a 350 Million Won Profit with Samsung and SK hynix"... 'Stock Jackpot' Grandfather Gains Attention
- Will Soaring Semiconductor Prices Support a Gradual Stabilization of the Household Debt Ratio? Why [BOK Focus]
- "Who Is Visiting Japan These Days?" The Once-Crowded Tourist Spots Empty Out... What's Happening?
To minimize citizen inconvenience during the construction period, the city plans to have the project operator, Dongbuk Line Urban Railway, operate a dedicated civil complaint desk.
© The Asia Business Daily(www.asiae.co.kr). All rights reserved.