[Breaking] Ministry of National Defense: "Nuclear-powered submarine to be built in the late 2020s, possible launch in the mid-to-late 2030s"

[Breaking] Ministry of National Defense: "Nuclear-powered submarine to be built in the late 2020s, possible launch in the mid-to-late 2030s" 원본보기 아이콘

[Breaking] Ministry of National Defense: "Nuclear-powered submarine to be built in the late 2020s, expected to be launched in the mid to late 2030s"

© The Asia Business Daily(www.asiae.co.kr). All rights reserved.