Published 01 Apr.2024 09:02(KST)
Updated 04 Aug.2025 17:05(KST)
KHNP Hanul Nuclear Power Headquarters (Head: Lee Seyong) announced, "At around 3:19 AM on April 1, Hanul Unit 6 (Pressurized Water Reactor, 1,000 MW class) was automatically shut down due to low steam generator water level."
The Hanul Nuclear Power Headquarters is currently analyzing the cause of the automatic shutdown and stated that the power plant remains in a safe condition.
© The Asia Business Daily(www.asiae.co.kr). All rights reserved.